Time: Jan., 2025
Place: Yangxin, Hubei province
Capacity: 200T/D
Membrane type: Tubular UF Membrane~HWM-TUF30-83E
Membrane QTY: 2pcs
Application: Landfill leachate
Introduction:
Hubei Yangxin Shenzhen Energy Group Incineration Project
Designed capacity:200t/d,
2pcs tubular UF membrane replaced in Jan., 2025,
Process: pretreatment + TMBR + NF + Material separation membrane+ RO,
Totally 2sets tubular UF system, 5 modules per set with designed capacity of 100t/d, single module membrane area is 27.2 ㎡, the permeate flow of each set is13m³/h, which is higher than the designed flow of 10m 3/h.

Operating data:
Operating pressure MPa | Circulating flow m³/h | Permeate flow m³/h |
0.45 | 267 | 13 |